BIDC industrial estate at dusk, Bhiwani

Tirupati Developers · Bhiwani, Haryana

Bhiwani Industrial Development ClusterWhere enterprises establish legacies

A Govt. of Haryana approved MSME industrial cluster on NH-709 — ready plots, plug & play sheds, and an ecosystem that lets factories start faster.जहाँ उद्योग बनते हैं विरासत।

WhatsApp Us
Govt. Approved

Govt. Approved

Haryana MSME Cluster · Feb 2026

Prime / Focus Area

Prime / Focus Area

Max incentives under MSME Policy 2026

Bhiwani–Loharu Road

NH-709 frontage

0.00

Acres · Phase 1

0

Industrial plots

0

Plug & play sheds (lease)

~0%

Already sold

Plot sizes 550–1,845 sq yd · complete infrastructure by October 2027

About the developer

We don't sell plots. We build ready ecosystems.

"Factories should start faster — with faster execution and less hassle. That is the whole idea behind BIDC."

Tirupati Developers is an industrial-focused developer with Bhiwani as home base. We know this land, its people and its industry — and we have built BIDC so that an entrepreneur can go from booking to production without fighting the system.

Land, approvals, infrastructure, finance and subsidies — the four things that slow a factory down — are handled at the estate level, before you ever break ground.

Land & Approvals

Clear titles, CLU, licences and cluster approval — already done. You buy ready, not promised.

Infrastructure

Industrial-grade roads, power, water, CETP & STP — built before you build.

Ecosystem

BDC, Exhibition Centre, Common Facility Centre and labour quarters inside the boundary.

Hand-holding

DPR, subsidy filings and bank loans — our team walks with you till production starts.

The moment

India is building. Haryana is leading.

Make in India, Aatmanirbhar Bharat and Viksit Bharat 2047 have turned manufacturing into a national mission. Haryana's Viksit Haryana push is taking industry beyond NCR — and Bhiwani sits on that corridor.

0.0%

GSDP growth 2025-26

vs India 7.4%

₹0.0 lakh Cr

State economy

among India's fastest

0%

Manufacturing share

vs 17% national

₹0.00 lakh

Per-capita income

1.75× India average

Sources: Haryana state budget & economic survey 2025-26. Figures as published.

Why Bhiwani

A city that has traded for 200 years

Bhiwani's industrial land is exhausted and its entrepreneurial energy is not. BIDC is where that energy moves next.

Supply exhausted

All 354 industrial plots in HUDA Sectors 21 & 26 stand allotted. Bhiwani's next address for industry is here.

270 rubber & plastic units

A working industrial base already thrives in the district — suppliers, buyers and skilled hands in place.

Business DNA

Guar gum exports, Bhiwani Textile Mills, TIT&S textile institute and a 200-year-old grain mandi.

Rail junction

Bhiwani junction connects Rewari, Hisar and Rohtak–Delhi — freight and workforce move with ease.

Location & connectivity

On NH-709, an hour from everywhere that matters

Hetampur, Bhiwani–Loharu Road — direct connectivity, the new grain market 16 km away, and the Western Dedicated Freight Corridor within scheduled reach.

Hetampur, Bhiwani–Loharu Road, NH-709

Get Directions
BIDC connectivity map
  • NH-709 (Bhiwani–Loharu Road)1.5 km
  • New Grain Market, Bhiwani16 km
  • NH-152D30 km
  • Hisar50 km
  • Delhi / Gurugram100 km

Rewari dry port — CONCOR Kathuwas MMLP on the Western Dedicated Freight Corridor — puts ports within scheduled reach.

Master plan

Walk the estate before it is built

Every block below is a real plot. Hover or tap to see its size and indicative price — then enquire about the exact one you want.

BIDC approved site plan

Sanctioned layout with plot demarcation — 60'-6" RCC roads, BDC & Exhibition Centre at the core.

BHIWANI – LOHARU ROAD · NH-70960.5 FT RCC ROAD60.5 FT RCC ROAD60.5 FT RCC ROADMAIN GATETHE HEART OF BIDCBDCApprovals · Subsidy · FinanceExhibition CentreBuyer–seller meetsCFCServo injection mouldingLabour QuartersCETPIndustrial effluentSTPSewage treatmentFire Station5 lakh litre storageWATERP-1 · 500 sq yd · SoldP-2 · 500 sq yd · AvailableP-3 · 550 sq yd · AvailableP-4 · 1000 sq yd · SoldP-5 · 550 sq yd · AvailableP-6 · 550 sq yd · AvailableP-7 · 1000 sq yd · AvailableP-8 · 1000 sq yd · SoldP-9 · 750 sq yd · SoldP-10 · 1000 sq yd · AvailableP-11 · 550 sq yd · SoldP-12 · 1000 sq yd · AvailableP-13 · 1000 sq yd · AvailableP-14 · 550 sq yd · AvailableP-15 · 1000 sq yd · SoldP-16 · 550 sq yd · AvailableP-17 · 750 sq yd · SoldP-18 · 1000 sq yd · AvailableP-19 · 550 sq yd · AvailableP-20 · 1000 sq yd · AvailableP-21 · 750 sq yd · AvailableP-22 · 1000 sq yd · AvailableP-23 · 750 sq yd · SoldP-24 · 750 sq yd · AvailableP-25 · 1000 sq yd · SoldP-26 · 750 sq yd · AvailableP-27 · 550 sq yd · AvailableP-28 · 550 sq yd · AvailableP-29 · 1000 sq yd · AvailableP-30 · 550 sq yd · AvailableP-31 · 750 sq yd · SoldP-32 · 750 sq yd · SoldP-33 · 1000 sq yd · AvailableP-34 · 1500 sq yd · SoldP-35 · 1845 sq yd · AvailableP-36 · 1500 sq yd · SoldP-37 · 1100 sq yd · AvailableP-38 · 1845 sq yd · SoldP-39 · 1700 sq yd · AvailableP-40 · 1100 sq yd · SoldP-41 · 1500 sq yd · SoldP-42 · 1500 sq yd · AvailableP-43 · 1700 sq yd · AvailableP-44 · 1100 sq yd · AvailableP-45 · 1845 sq yd · SoldP-46 · 1250 sq yd · AvailableP-47 · 1250 sq yd · AvailableP-48 · 1700 sq yd · SoldP-49 · 1500 sq yd · SoldP-50 · 1700 sq yd · AvailableP-51 · 1700 sq yd · AvailableP-52 · 1500 sq yd · SoldP-53 · 1250 sq yd · AvailableP-54 · 1250 sq yd · SoldP-55 · 1845 sq yd · AvailableP-56 · 1700 sq yd · AvailableP-57 · 1700 sq yd · AvailableP-58 · 1100 sq yd · AvailableP-59 · 1250 sq yd · AvailableP-60 · 1700 sq yd · AvailableP-61 · 1500 sq yd · AvailableP-62 · 1700 sq yd · AvailableP-63 · 1250 sq yd · AvailableP-64 · 1250 sq yd · SoldP-65 · 1845 sq yd · SoldP-66 · 1100 sq yd · AvailableP-67 · 1250 sq yd · AvailableP-68 · 1700 sq yd · SoldP-69 · 1500 sq yd · AvailableP-70 · 1500 sq yd · SoldP-71 · 1500 sq yd · SoldP-72 · 1845 sq yd · AvailableP-73 · 1700 sq yd · AvailableP-74 · 1500 sq yd · AvailableP-75 · 1845 sq yd · SoldP-76 · 1100 sq yd · SoldP-77 · 1100 sq yd · AvailableP-78 · 1700 sq yd · SoldP-79 · 1100 sq yd · SoldP-80 · 1100 sq yd · SoldP-81 · 1700 sq yd · SoldP-82 · 1250 sq yd · AvailableP-83 · 1500 sq yd · AvailableSH-1 · Plug & play shed · For leaseSH-2 · Plug & play shed · For leaseSH-3 · Plug & play shed · For leaseSH-4 · Plug & play shed · For leaseSH-5 · Plug & play shed · For leaseSH-6 · Plug & play shed · For leaseSH-7 · Plug & play shed · For leaseSH-8 · Plug & play shed · For leaseSH-9 · Plug & play shed · For leaseSH-10 · Plug & play shed · For leasePLUG & PLAY SHEDS · LEASE
Compact · ~500 sq yd · 2 plots500–1,000 sq yd · 31 plots1,000–2,000 sq yd · 50 plotsPlug & play shed · lease · 10 shedsSold

Hover or tap any plot on the plan to see its size, price and availability.

60.5 ft RCC internal roads on a gridBDC + Exhibition Centre + CFC at the heartLabour quarters inside campusFire station & water tankCETP & STP inside boundaryMain gate on NH-709

Infrastructure

Industrial-grade, from day one

Not promised infrastructure — completion-linked infrastructure. Your payments move only as the estate does.

60.5 ft RCC roads

Wide concrete internal roads on a grid, built for trailers and containers.

24×7 industrial power

Independent industrial feeders — no domestic load sharing.

CETP + STP

Separate industrial effluent and domestic sewage lines inside the boundary.

Fire station

On-site fire station with 5 lakh litre dedicated water storage.

Dual water lines

Fresh and recycled water networks run side by side.

Rain water harvesting

Groundwater recharge built into the estate design.

CCTV & gated campus

Single controlled entry, estate-wide surveillance.

Green campus

Tree-lined avenues soften a hard-working estate.

Labour quarters

Worker housing inside the campus — zero commute.

The ecosystem

More than land — a working support system

Approvals, markets, machinery and manpower. The four things every factory needs, built into the estate itself.

Business Development Centre
Business Development Centre

Business Development Centre

Single window for approvals, subsidy filings and finance. Networking, mentoring and paperwork — under one roof.

Exhibition Centre
Exhibition Centre

Exhibition Centre

Year-round product showcase, buyer–seller meets and trade fairs — your market comes to you.

Common Facility Centre
Common Facility Centre

Common Facility Centre

Servo injection moulding machines — prototype, test and scale without buying heavy machinery.

Labour Quarters
Labour Quarters

Labour Quarters

0 km commute makes 3 shifts practical and keeps attrition low.

Who belongs here

Every manufacturing unit is welcome

If you make things, BIDC is zoned, approved and ready for you.

Industries welcome

  • Plastic products & moulding
  • Pipes, wires & packaging
  • Non-woven & technical textiles
  • Engineering & metal
  • Electrical goods
  • Food processing
  • Textiles & garments

Packaging makers & transporters: an estate of factories needs both — a ready customer base at your gate.

Already signed up

Units that have already chosen BIDC — your future neighbours.

Injection mouldingPlastic furniturePipe manufacturingElectrical wiresNon-woven fabricsPP yarnTechnical textilesMetal industries

"जो पहले आता है, वो अपनी जगह पहले चुनता है।"

Early movers pick the best plots.

Government incentives

Haryana pays you to build here

BIDC is an approved MSME cluster in a Prime / Focus Area under the Haryana Progressive MSME & Export Promotion Policy 2026.

35%

Capital investment subsidy

up to ₹4 Cr

100%

Stamp duty refund

on plot registration

70%

Net SGST reimbursement

for 7 years

7%

Interest subsidy

up to ₹25 lakh / year

Power subsidy ₹2/unit for 5 years Solar rooftop 30% assistance Automation 25% assistance R&D / lab setup 50% assistance Quality certification 50% support Export freight support Local employment ₹1.2 lakh / person Food processing capital subsidy up to 45% Textiles sector capital subsidy up to 40%

Illustrative: a ₹2.3 Cr unit

Capital investment subsidy (35%)≈ ₹80.5 L
Stamp duty refund (100%)≈ ₹8 L
Net SGST reimbursement (7 yrs)≈ ₹75 L
Interest subsidy (7%, capped)≈ ₹25 L
Total support (indicative)≈ ₹1.9 Cr back over 5 years

*Illustrative only. Actual benefits depend on eligibility, approvals and policy terms. All incentives are subject to eligibility and approval under the Haryana Progressive MSME & Export Promotion Policy 2026 and respective sector policies.

Plots & pricing

Own your factory's address

Five standard sizes, completion-linked payments, and construction that can start right after booking.

Plot size
550 sq yd
750 sq yd
1,000 sq yd
1,500 sq yd
1,845 sq yd

Current pricing is shared on call or at the site office. Plug & play sheds available for lease.

Payment plan

Light on cash flow, linked to construction progress.

5% booking, then 25% × 4 completion-linked milestones over 1 year.

Up to 90% bank loan with Bank of Maharashtra (allied bank).

Construction can start right after booking — no waiting for possession.

Current pricing on request

Call us or book a site visit for the latest plot-wise rates.

9817777265

The real math

Raw land vs a BIDC plot

A ½ acre of agricultural land looks cheaper — until you price everything it doesn't come with. Tap any row.

The raw land route

True cost of raw land₹1.01 Cr – ₹1.17 Cr

+ months of delays before construction can even begin.

The BIDC plot

₹1 Cr*

* Tentative pricing

  • Levelled, approved industrial land
  • 60.5 ft RCC roads to your gate
  • 24×7 industrial power feeder
  • CETP + STP already inside
  • Fire station, CCTV, boundary, gate
  • Labour quarters & ecosystem

Same money. Zero delays. A factory address, not a land file.

Construction timeline

From approval to a working estate

Payments are completion-linked — this timeline is what your money follows.

Mar 2026

Soft launch & Govt. approval

Cluster approved by Govt. of Haryana. Booking opens.

Jan 2027

Roads & boundary

60.5 ft RCC internal roads and campus boundary take shape.

Apr 2027

Power, CETP & STP

Industrial feeders energised; effluent and sewage plants commissioned.

Oct 2027

Infrastructure complete

Full estate ready — build, lease, produce.

For investors

Enter early on an approved corridor.

Industrial land rewards early entry. BIDC is Phase 1 pricing on a Govt.-approved corridor.

Ground-floor entry

NCR industrial plots trade at ₹20,000–30,000 per sq yd. BIDC is the early chapter, not the epilogue.

Limited supply

77 plots and 10 sheds in Phase 1 — with HUDA sectors in Bhiwani fully allotted, scarcity is structural.

Leasing demand

Plug & play sheds and labour quarters create rental yield from operating businesses.

Value tracks infrastructure

Each milestone — roads, power, CETP — reprices the estate.

Limited inventory. ~40% already gone.

*Past price trends are no guarantee of future returns. Invest after your own due diligence.

Channel partners

Sell the address Bhiwani is waiting for

Approved project, bank tie-up, completion-linked payment plan — a product your clients will thank you for.

  • Ready inventory across 77 plots and 10 sheds
  • Govt.-approved project — clean paperwork your clients can verify
  • Bank of Maharashtra loan tie-up makes closures easier
  • Dedicated partner support from the Bhiwani site office

Become a channel partner

Trust & approvals

Verify everything before you pay anything

Every document is open for inspection at the site office. Come see the file, then the land.

Govt of Haryana approvalMSME cluster approval

Govt.-approved cluster

MSME cluster approved by Govt. of Haryana, February 2026.

Prime / Focus Area

Estate classification that unlocks the highest incentive slab.

Bank of Maharashtra tie-up

Allied bank for project loans — up to 90% financing.

Estate-level CLU

Change of land use handled by the developer, not left to you.

Completion-linked payments

5% booking, then payments only as infrastructure completes.

Documents at site office

Titles, approvals and layouts open for inspection on site.

How booking works

Five steps to your factory plot

  1. 01

    Visit site

    Walk the land, see the approvals, meet the team.

  2. 02

    Choose plot

    Pick your size and frontage on the master plan.

  3. 03

    Book with 5%

    Block your plot with a small booking amount.

  4. 04

    Agreement & loan

    Paperwork and up to 90% bank loan, hand-held by us.

  5. 05

    Build & claim

    Construct immediately; our BDC team files your subsidies.

Questions

What buyers usually ask us

Visit us

The site office is open. Come see the land.

Book your site visit

Chai is on us. The plots speak for themselves.

Tirupati Developers — BIDC

Bhiwani Industrial Development Cluster — a Govt. of Haryana approved MSME cluster on Bhiwani–Loharu Road, NH-709, by Tirupati Developers.

Site office

Site Office: Bhiwani–Loharu Road, NH-709, Bhiwani, Haryana

7056550679 · 7090300000

Tirupatidevelopersbhiwani@gmail.com

"India is building. Build with us."

*All prices, payment plans and incentives mentioned are indicative and subject to change, eligibility and approval under applicable policies. Images are illustrative. Please verify all details at the site office before booking.

© 2026 Tirupati Developers, Bhiwani. All rights reserved.